Year:
      2012-2013
Location:

      Karaj - Iran
Client:
      CinnaGen Biopharma Complex
Contractor:
      Mahan Rahavard
Plant Specification:
      CinnaGen Biopharma is a biopharmaceutical manufacturer . The new site is built in three levels and covers more than 6000 (m2) that include 4500 (m2) clean-room area and space for technical maintenance and engine room on a technical floor.
Scope of work:
      EPC (Engineering, Procurement & Construction) of BMS including HVAC control system, device monitoring, clean rooms pressure and temperature control and monitoring .
Hardware:
      Beckhoff PLC
Architecture & IO Quantity:
     • 27 sets of AHU control panels
     • 1 set of QC Department control panel
     • 4 sets of RC Department control panels
     • 3 sets of FF Department control panels
     • 1 set of Mechanical Room control panel
     • Modbus Network for AHU Controllers & Variable Frequency Drives & VAVD Actuators
     • Industrial Ethernet Network between panels
     • Central Monitoring System
Software Specification:

     • Twincat
     • Citect (Two SCADA Server & three Client stations)