Year:
      2010-2011
Location:

      Izeh-Iran
Client:
      IWPC (Iran Water & Power Resources Dev. Co.)
Contractor:
      ALSTOM
Plant Specification:
      4x250 MW Hydroelectric Power Plant
Scope of work:
      Unit Control & Protection system commissioning and startup
Hardware:
      ALSPA P320 (Redundant PCX control system)
Architecture & IO Quantity:
     • 4 sets of Unit Control Boards & local HMI
     • 4 sets of protection panels
     • Auxiliary control panel
     • Common PLC and SCADA control panel
     • DAM control panel
     • S8000 redundant optical fiber network
Software Specification:

     • Two redundant CENTRALOG stations
     • Two historian servers
     • One Large screen display (4 LSD)