Year:
      2010
Location:

      Lorestan - Iran
Client:
      I.O.P.T.C. (Iranian Oil Pipelines and Telecommunication Company)
Contractor:
      Jahad-e-Nasr
Plant Specification:
      Tang-e-Fanni to Darre Shahr New 10” oil pipeline
Scope of work:
      Control system including design, fabrication, procurement, construction, programming, installation and commissioning of control system.
Hardware:
      SIEMENS PLC S7-400H
Architecture & IO Quantity:
     • Control panel : Redundant S7414-4H system
     • Redundant OS stations
Software Specification:
     • STEP7
     • WinCC