Year:
      2008
Location:
      Ilam - Iran
Client:
      HDPE PLANT, Ilam Petrochemical Complex
Contractor:
      Iran Seabock
Scope of work:
      (PDCS) Power Distribution Control System design , commissioning & startup
Hardware:
      SIEMENS S7400H system + WinCC
Architecture & IO Quantity:
       IO requirements:
     • 1 set of 20 kV switchgear
     • 1 set of 6 kV switchgear
     • 1 set of MCC switchgear
     • One 1.8 MW diesel generator
     • 1 set UPS
     • 1 set Battery charger
     • Serial Modbus communication with Siemens SIPROTEC Relays
Software Specification:
     • STEP7
     • Two WinCC stations